techmachinery logo

DETALII PRODUS

MAZAK VARIAXIS i-700

Analizează configurația utilajului, evidențierile tehnice, notele de sourcing și detaliile necesare înainte de solicitarea ofertei.

Final AI image target: /photos/featured-mazak-real.webp

Real MAZAK five-axis machining center photographed as a premium production machine visual

Gallery

Primary machine view

3 Views
Real MAZAK five-axis machining center photographed as a premium production machine visual

5-axis workspace

Real MAZAK five-axis machining center photographed as a premium production machine visual

Factory allocation

NewCNC

MAZAK / 5-Axis Machining Center

VARIAXIS i-700

Simultaneous 5-axis machining for complex prismatic, aerospace, energy, and die-mold components where one-setup accuracy is critical.

An

2025

Ore

0 h

Locație

EU factory allocation

Disponibilitate

Reserved build slot

Evidențieri tehnice

Rezumat capabilități utilaj

Date pregătite pentru RFQ
Table Diameter: Ø700 mmSpindle: 12,000 RPMMax Load: 500 kgSimultaneous 5-axis

Tabel specificații

Date tehnice ușor de citit

CapacityTable diameterØ700 mm
SpindleSpindle speed12,000 RPM
TableMaximum table load500 kg
MotionAxis capabilitySimultaneous 5-axis machining
ControlControl platformMazatrol Smooth series configuration dependent
CommercialBuild slotFactory allocation subject to configuration lock

Note logistice și sourcing

  • Reserved build slot requires early confirmation of options, probing, coolant, and automation interfaces.
  • techmachinery can coordinate factory documentation, import timeline, installation planning, and acceptance workflow.
  • Recommended for buyers who can prepare foundation, utilities, and tooling plan before delivery window.

Întrebări recomandate pentru cumpărător

  1. 01Define maximum part size, weight, materials, and 5-axis tolerance requirements.
  2. 02Confirm CAM workflow, probing strategy, coolant pressure, and chip management needs.
  3. 03Prepare installation plan including foundation, access route, power, air, and coolant infrastructure.
  4. 04Share target commissioning date and required training scope for operators and programmers.